Solar array at Immingham depot begins generating
A 1.8 MW rooftop and carport installation is expected to supply about a third of the depot’s annual electricity use.
A 1.8 MW rooftop and carport installation is expected to supply about a third of the depot’s annual electricity use.
Scope 1 and 2 emissions fell 18 per cent against the 2023 baseline, with new targets set for 2030 and a fully assured emissions dataset.
Six battery-electric tractor units will run on intra-port shuttles for twelve months as the group tests charging and duty cycles.