Tilbury rail siding upgrade doubles weekly train capacity
A £6.5 million investment lengthens the siding to accept 775-metre trains and adds a second loading road.
A £6.5 million investment lengthens the siding to accept 775-metre trains and adds a second loading road.
A 12,000 square metre groupage facility at Waalhaven removes a handling step from most consignments and later cut-off times into the Ruhr.
The new bays give North Logistics space for temperature-sensitive and high-value industrial cargo.